Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Nippon Steel begins blast furnace to EAF conversion at Kyushu Work-Die Casting Exhibition-Foundry Exhibition-The 26th China(Guangzhou) International Die casting Foundry & Industrial Furnace Exhibition
4/21/2026  壓鑄展-鑄造展- Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    Japanese steelmaker Nippon Steel has announced that it has commenced construction to convert blastfurnace-based production to an electric arc furnace (EAF) process at its Kyushu Works (Yawata area), markinga major step in its decarbonization strategy.
The project aims to establish what the company describes as the world''s first integrated mass production
system for high-grade steel using a large-scale EAF.The initiative forms part of Nippon Steel''s "Carbon Neutral Vision 2050," which focuses on three coretechnological pathways: high-grade steel production via large EAFs, hydrogen-based iron reduction, andhydrogen injection into blast furnaces. The company plans to implement these technologies across multipleproduction sites. Large-scale EAF at Yawata
At the Kyushu Works (Yawata area), Nippon Steel willinstall a large-scale EAF with an annual crude steelproduction capacity of approximately 2 million mt. Theproject also includes secondary refining and continuouscasting facilities.
Construction has already begun, with operationsscheduled to start in the second half of fiscal year 2029.The total investment amounts to JPY 630.2 billion ($3.96billion).
Expansion across multiple sites
At Setouchi Works (Hirohata area), the company plans to install an EAF with a production capacity of around500,000 mt per year, supported by secondary refining equipment. The investment is estimated at JPY 140
bilion ($879.82 million), with operations expected to begin in the second half of fiscal year 2029.At Yamaguchi Works (Shunan area), a new EAF with a capacity of approximately 400,000 mt per year will beinstalled, with an investment of JPY 98.5 bilion ($619.02 million). This facility is scheduled to come online in the second half of fiscal year 2028.

壓鑄展-鑄造展-2026第二十六屆廣州國際壓鑄、鑄造及工業爐展覽會-Die Casting Exhibition-Foundry Exhibition-The 26th China(Guangzhou) International Die casting Foundry & Industrial Furnace Exhibition 2026壓鑄展,2026壓鑄展會,2026壓鑄展覽會,2026鑄造展,2026鑄造展會,2026鑄造展覽會,2026廣州壓鑄展,2026廣州壓鑄展會,2026廣州壓鑄展,2026廣州鑄造展會,廣東鑄造展,中國鑄造展會,廣東鑄造展,中國鑄造展會,2026有色鑄造展會,2026壓鑄展會信息,2026鑄造博覽會,2026壓鑄博覽會,2026壓鑄機展,2026壓鑄機展會 2026鑄造設備展-Die-casting Industry Exhibition,Die-casting expo, 2026 Die-casting exhibition, 2026 Die-casting expo, China Die-casting exhibition, China Die-casting expo,Die-casting Industry event,Die-casting event, 2026 Die-casting event,Die-casting event 2026, China Die-casting event, China Die-casting event,foundry Industry Exhibition,foundry expo, 2026 Die-casting exhibition, 2026 foundry expo, China foundry exhibition, China foundry expo,foundry Industry event,foundry event, 2026 foundry event,foundry event 2026, China foundry event, China foundry event   內容摘抄于網絡,如有侵權,請聯系刪除 020-38620785,zheng@julang.com.cn
Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China